HowTo:Construction Contract/Project Setup: Difference between revisions

Jgerard (talk | contribs)
No edit summary
Jgerard (talk | contribs)
No edit summary
 
(One intermediate revision by the same user not shown)
Line 135: Line 135:
:: 1. This tab shows a summary of the Estimates tabs and how it impacts your Markup and Total Contract Amount.
:: 1. This tab shows a summary of the Estimates tabs and how it impacts your Markup and Total Contract Amount.
[[File:Construction_Contract_Est_Summary.png]]
[[File:Construction_Contract_Est_Summary.png]]
:Labor Tab
:: 1. Work Time in Hours
::*As labor is entered from the web site, it will appear in the grid
::*Hours may also be entered directly into the grid
::**Enter Date work was performed
::**Enter Position
::**Enter Last Name
::**Enter First Name will autofill
::**Enter Shift
::**Enter Cost Code
::**Enter Number of Hours Worked
::**Rate will autofill
::**Enter Type
::**If a Per Diem is issued, check the box
::**If they get an Allowance, check the box
::**Enter Description of Work
:: 2. Labor Summary button - to approve hours
:Equipment Tab
:: 1. Equipment
::*As equipment is used on the job it is entered from the website and will appear in the grid
::*Equipment may also be entered directly into the grid
::**Enter Date Equipment was used
::**Enter Equipment #
::**Description will autofill
::**Enter Shift equipment was used
::**Enter Code
::**Enter the number of hours used
::**Rate will auto-calculate
::**Total will auto-calculate
::**Enter Comment for use of equipment
:Material Tab
:: 1. Materials
::*As Material is needed on the job it is entered from the website and will appear in the grid
::*Material may also be entered directly into the grid
::**Enter Date Material was requested
::**Enter Description of Material needed
::**Enter Shift the material will be used on
::**Enter Quantity of Material to be sued
::**Enter Price if known
::**Enter Sales Tax
::**Total will auto-calculate
::**PO # will be entered after order is placed once integrated
::**Comment – enter PO#
:Notes
:: 1. LEM Notes
::*As work is performed out in the field, the Foreman will enter the daily notes to be printed on the LEM
::*All LEM notes for the contract appear here
:: 2. Voucher Notes
::*As work is performed out in the field, the Foreman or Project Manager will enter the note to be printed on the Voucher
::*All Voucher notes for the contract appear here
Return to "Construction Contract/Project Setup" page.