:Estimates Tab
:: 1. Select a category at the left.  Category selected will be a different color than remaining categories (colors will vary based on theme selected). The cost center items related to the category selected will appear on the right under Estimate Detail.
::*Contract Est Remaining will decrease as estimates are entered into the grid. When done entering estimates the Contract Est Remaining should = 0.00.
::*The total for each category appears at the bottom of the grid.